Local listed building consent order
The designation of ‘listed building’ places special controls on the demolition, alteration or extension of buildings, objects or structures of particular architectural or historic interest. Demolition, alteration or extension of a listed building in a way that is likely to affect its special architectural or historical interest is only allowed with listed building consent.
Local planning authorities can grant Local Listed Building Consent Orders which grant a general listed building consent order for works that alter or extend certain listed buildings in their area (demolition works are not included). This means that owners or developers do not need to apply for repeat listed building consent for works that are covered by the order. They are likely to be used for groups of similar or related listed buildings in multiple ownership, for example, estate villages or terraced houses.
This is different to a Listed Building Heritage Partnership Agreement (LBHPA), which is an agreement between a local planning authority and the owner of a listed building, or group of buildings, which grants listed building consent for types of works (alterations or extensions) to the building(s) for the duration of the agreement.
The duration of a Local Listed Building Consent Order is determined by the local planning authority. Within the Order, the land and buildings to which the Order relates is defined along with details of what type of works are covered. It is recommended that a record (written and photographic) is kept of any works undertaken to assist the local planning authority with monitoring the Order.
Under the Planning (Local Listed Building Consent Orders) (Procedure) Regulations 2014, owners and any other interested parties must be provided with an opportunity to comment on a draft Order. The consultation period will be for a minimum of 28 days. Historic England (formerly English Heritage) must also be consulted on any draft Order relating to Grade I or II* buildings, or any building that is owned by the local planning authority.
Once the Order is adopted, it is recommended that regular reviews are undertaken to ensure that it remains fit for purpose. The local planning authority must prepare annual reports whilst the order is in place.
[edit] Related articles on Designing Buildings
- Are works to listed buildings demolition or alteration?
- Historic England.
- IHBC responds to Review of the Mission and Pastoral Measure 2011.
- Listed building.
- Listed building consent order.
- Listed building heritage partnership agreement.
- Locally listed building.
- Mission and Pastoral Measure 2011.
- Planning permission.
- Port Sunlight's local listed building order.
[edit] External references
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
Comments
[edit] To make a comment about this article, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.